南水北调中线膨胀岩(土)渠段抗滑桩施工 被引量:1

Anti-slide pile construction at expansive soil channel section of Middle Route Project of South to North Water Diversion
下载PDF
导出
摘要 南水北调中线禹长段工程在初步选定渠道边坡抗滑桩断面及人工成孔方法后,为保证工程进度及施工安全,将成孔方法调整为机械成孔法,并依据不同地质条件分别选用了液压抓斗和旋挖钻两种设备展开现场生产性试验。根据现场试验结果,调整了抗滑桩设计断面,满足了机械化施工要求。在施工过程中,抗滑桩布置实施动态设计管理,减少了工程量并节约了工程投资,技术经济成效明显。 The anti-slide pile section and artificial hole-forming mode of Yuzhou to Changge section of Middle Route Project of South to North Water Diversion was determined initially,so the hole-forming by machine was adopted to guarantee the construction progress and safety.In-situ trail tests of hydraulic grab and auger drill was carried out respectively according to different geological stratum,based on which,the previous anti-slide pile section was adjusted to meet mechanical construction requirements.During construction,the layout of anti-slide pile stuck to the principle of dynamic design,which had reduced engineering quantity and saved cost.
作者 李申亭
出处 《人民长江》 北大核心 2014年第10期27-29,共3页 Yangtze River
关键词 膨胀岩(土) 抗滑桩 地质窗口 动态设计 expansive soil anti-slide pile geological window dynamic design
  • 相关文献

同被引文献11

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部