焦炭塔进料短管内加装导流板后可能影响装置的正常生产,文章针对可能造成的各种不利影响进行了的计算分析,确认进料短管内加装导流板这一改造措施安全可行。
It may affect the normal production after installing a guide plate in feed pipe of coking column. In the paper, a variety of possible adverse effects have been analyzed, and the plan of installing a guide plate in feed pipe ofcoking column is proved to be safety and feasible.