建筑幕墙热循环试验技术研究 被引量:5

Study on Thermal Cycling Test Technology of Building Curtain Wall
下载PDF
导出
摘要 本文根据建筑幕墙试件图纸及其热循环试验方案要求,研制了热循环试验装置。通过太阳灯管给幕墙试件加热,使用热电偶测量温度,达到预设温度后,通过温控仪对太阳灯进行控制,维持幕墙试件温度一段时间后断电,使用水淋与空调制冷的方法使试件温度达到常温。应用实例表明,该技术能满足试验方案要求,幕墙试件温度均匀,升温与降温速度较快,效果良好。 According to the drawings of building curtain wall specimens and the requirements of thermal cycling test, thermal cycling test device is developed. The curtain wall specimen is heated by solar lamps, and the temperature is measured by thermocouples. After reaching the preset temperature, the solar lamps are controlled by the temperature controllers to maintain the curtain wall specimen temperature. Then, disconnecting the power, the specimen is cooled to room temperature with water and air conditioning. The thermal cycling test technology can meet the test requirements. The specimen temperature is uniform, and the heating and cooling is fast. The effect is satisfactory.
出处 《广州建筑》 2014年第2期33-36,共4页 GUANGZHOU ARCHITECTURE
基金 广州市科技计划项目 项目编号:2013J4300024 2013Y2-00036
关键词 建筑幕墙 热循环 太阳灯加热 淋水降温 building curtain wall thermal cycling test solar heating water cooling
  • 相关文献

参考文献5

二级参考文献2

  • 1.CWCT Standard test methods for building envelops Part8:2005section18.Standard thermal cycling regime[]..2005
  • 2.AAMA501.5.98 Test Method for Thermal Cycling of Exterior Walls[]..1998

共引文献3

同被引文献29

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部