摘要
预制箱梁钢筋骨架整体入模施工方法具有施工速度快和工程质量易于保证的特点,特别在30 m以上的大型预制箱梁施工时能够体现出突出的优越性,但在工程实施时必须注意材料的选择、作业工序和工程组织的合理性,才能收到预期的效果。
This paper described the construction methods of the precast box beam steel skeleton integral entry molding, which had the advantages of fast construction speed and project quality assurance, especially in the construction of more than 30 meters large precast box beam. It also pointed out the rationality of material selection, operation process and project organization must be paid attention in the implementation of the project to receive the desired effect.
出处
《山西交通科技》
2014年第1期75-77,共3页
Shanxi Science & Technology of Transportation
关键词
箱梁
钢筋骨架
整体入模
工艺
实施
box beam
steel skeleton
integral entry molding
technology
implementation