5Reigh A. Analysis of wind generation impact on ERCOT ancillary services requirements[R]. New York: GE Energy, 2008.
6Banakar H, Luo C, Ooi B K. Impacts of wind power minute-to-minute variations on power system operation [J]. IEEE Trans. on Power Systems, 2008, 23(1): 150-160.
7Papaefthymiou G, Klockl B. MCMC for wind power simulation[J]. IEEE Trans. on Energy Conversion, 2008, 23(1): 234-240.
8Chen P, Pedersen T, Bak-Jensen B, et al. ARiMA-based time series model of stochastic wind power generation [J]. IEEE Trans. on Power Systems, 2010, 25(2): 667-676.
9Carta J, Ramirez P, Velazquez S. A review of wind speed probability distributions used in wind energy analysis [J]. Renewable and Sustainable Energy Reviews, 2009, 13(5): 933-955.
10Villanueva D, Pazos J L, Feijoo A. Probabilistic load flow including wind power generation[J]. IEEE Trans. on Power Systems, 2011, 26(3): 1659-1667.