摘要
重庆枢纽布局调整后,枢纽的解编系统发生变化,需要在规划的货运通道上新建新的枢纽编组站,来解决枢纽客货分线、解编能力不足等问题,本文则根据新的编组站需要满足各种设计要求,最终确定编组站的最佳平面布局。
Chongqing hub layout is adjusted, hub solutions of system changes, new new huh planning of freight channel is needed in the marshalling yards, to solve the hub passenger line, solution ability is insufficient, this paper is ac- cording to the new need to meet the design requirements of the marshalling station, uhimately determine the optimal layout of marshalling yards.
出处
《江西建材》
2014年第10期182-183,共2页
Jiangxi Building Materials
关键词
枢纽布局
客运系统
货运系统
解编系统
hub layout
passenger system
cargo system
break - up and formation system