期刊文献+

原子喷泉中回落信号原子数损失的估计 被引量:1

A Loss Estimation for Dropping-back Atom Number in the Atomic Fountain
下载PDF
导出
摘要 本文以新的角度 ,考虑到信号原子速度远少于本底气体分子 (原子 )热运动速度的实际情形 ,给出原子喷泉中回落信号原子因碰撞散射和原子云扩大所致损失的估计方法 ,并以我们设计的原子喷泉有关数据为例进行具体估算 ,给出量化概念。该方法曾应用于国外原子喷泉 ,其理论预期与实验结果相当符合。 The author proposed a loss estimation method for dropping back atom number in the atomic fountain from a new point of view and considering the practical situation in which the velocity of signal atoms are much slower than the background gas atoms. As a numerical example we have done a calculation substituted in our fountain parameters. The estimation method has been also used to other fountain worked in foreign country and got quite agreement with their experimental results.
出处 《现代计量测试》 2001年第1期53-55,59,共4页 Modern Measurement and Test
关键词 原子喷泉 原子云 碰撞散射 高斯分布 频率基准 回落信号 原子数损失 估算 atomic fountain atom cloud collision scattering gauss distribution
  • 相关文献

同被引文献3

  • 1W. Liji, Wu Changhua. Huang Bingying et al.. Design & Preliminary Results of NIM Cesium Fountain Primary Frequency Standard [C]. Proc. of the 1999 Joint Meeting of EFTF-IEEE-IFCS, France. 1999. 30-33.
  • 2D. M. Meekhof. S. R. Jefferts. D. Lee et al.. NIST Cesium Fountain Frequency Standard: Preliminary Results [C]. 1998 CPEM Digest, p130-131; Proc. of 1998 IEEE-IFTS, 2-5.
  • 3李天初,李明寿,黄秉英,钱进,林平卫,费全度,干云清,辛明德,王平,石春英,赵晓惠,吴长华.2000年NIM铯冷原子喷泉时间频率基准装置研究的进展[J].现代计量测试,2001,9(2):8-12. 被引量:2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部