甬子沟水利枢纽工程电气设计

Electric Engineering Design for Yongzigou Hydro Junction
下载PDF
导出
摘要 随着我国经济的快速发展,各地区中小型水力发电站也得到迅速发展。但随着时间的推移,这些小型水电站也暴露出一些问题,电站厂房年久失修,发电机组运行时间过长,检修不及时,造成供电量不足。原有的技术条件下已经不能满足正常运转,事故时有发生,文章通过对甬子沟水利枢纽工程电气设计,对水电站发电的可靠性,布局的合理性提出新的要求。 With the rapid development of economy,the area of small hydroelectric power station has been the rapid development in China.But with the passage of time,some problems for this small hydropower station have also appeared,such as disrepair powerhouse,too long running time for generating units,not timely maintenance,causing power shortage.The original technology has been unable to meet the normal operation,when the accident occurred.Thorough the discussion of electric engineering design for Yongzigou Hydro Junction,the reliability of the hydropower station,the reasonable layout are proposed.
作者 马云燕
出处 《黑龙江水利科技》 2014年第4期37-40,共4页 Heilongjiang Hydraulic Science and Technology
关键词 水利枢纽 电气一次 方案比较 电气主接线 设备选择 hydro junction electric A scheme comparison main electric line equipment selection
  • 相关文献

参考文献4

二级参考文献42

共引文献83

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部