摘要
结合工作经验,对混凝土桥梁冬季施工条件下引发的凝结时间限制、浇筑温度、保温措施、拆模时间等问题进行了分析,并对具体的解决措施作了研究,提出了相应的养护方法,以确保工程的质量。
Combining with working experience,the paper analyzes concrete bridge winter construction problems including setting time,casting temperature,thermal insulation measures and dismantling template time and so on,studies specific solving measures,and puts forward corre-sponding maintenance methods,with a view to guarantee engineering quality.
出处
《山西建筑》
2014年第17期137-137,169,共2页
Shanxi Architecture
关键词
混凝土
桥梁
施工
措施
concrete
bridge
construction
measures