摘要
以清石河特大桥11#墩承台为例,介绍了大体积混凝土施工中应采取的裂缝和温度控制措施,并通过实测数据对温控效果进行了分析,实践证明了施工中所采取的措施是有效的。
Combining with clear stone river 11#pier pile caps of the large bridge as an example, introduced the mass concrete cracks and temperature control measures should be taken in the construction, and through the measured data of temperature control effect is analyzed, the practice proved that the construction measures taken are effective.
出处
《工程建设与设计》
2014年第6期140-142,共3页
Construction & Design for Engineering
关键词
大体积
承台混凝土
现场施工技术
large volume
concrete pile cap
site construction technology