浅谈桃源水电站厂房建设中存在的问题及解决方案

Problems in the Design of Powerhouse of Taoyuan Hydropower Station and Its Solutions
下载PDF
导出
摘要 介绍了桃源水电站厂房设计过程中遇到的一些问题,如结构分缝、进水口和尾水门机轨道梁、主副厂房、厂区集水井及前流道里衬的设计等。为减少工程投资、降低施工难度、节约工期,结合现场实际施工情况,在保证结构安全的前提下,针对这些存在的问题进行了优化设计,确保了厂房建设的工程质量与施工进度。 The problems in the design of powerhouse of Taoyuan Hydropower Station are introduced, including structure joints, rail beams of gantry cranes in intake and tailwater, main and auxiliary powerhouses, water collection well of powerhouse and front flow channel lining. To reduce investment, construction difficulty and construction duration, some designs are optimized to solve above problems after considering the actual construction conditions and on the basis of structure safety can be ensured. These optimizations ensure the quality and progress of powerhouse construction.
作者 曾庆平
出处 《水力发电》 北大核心 2014年第6期35-38,共4页 Water Power
关键词 厂房设计 施工分缝 门机轨道梁 主厂房 副厂房 桃源水电站 powerhouse design construction joint gantry crane rail beam main powerhouse auxiliary powerhouse TaoyuanHydropower Station
  • 相关文献

参考文献2

  • 1中国水电顾问集团中南勘测设计研究院.湖南沅水桃源水电站一期工程河床式厂房蓄水安全鉴定设计自检报告[R].长沙:中国水电顾问集团中南勘测设计研究院,2013.
  • 2SL266-2001.水电站厂房设计规范[S].[S].,..

共引文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部