摘要 桃源水电站主变压器采用的是一种新型结构电力设备,高压侧通过油/气套管和GIS设备直接连接,电站主变压器常规试验项目在不打开与其相连的SF6气室拆除油气套管接头的情况下,通过变通试验接线方式实现,并且试验数据与常规试验方式无明显差异。采用这种试验方法不仅可以避免回收SF6气室气体、打开SF6气室拆除油气套管接头、试验完成后对SF6气室抽真空补气等复杂、繁重的工作,大大缩短检修时间,并且可以避免在处理过程中造成气室漏气等次生故障与隐患。 The structure ot main transtbrmers in Taoyuan Hydropower Station is a new type, in which, the high voltage side outlets are directly connected to GIS device through oil/gas casings. The routine tests of transformer are carried out by changing the test connection without opening SF6 chamber and disconnecting oil/gas casings. There is no significant difference between the test data of this method and conventional methods. The new test method not only avoids recycling SF6 gas, disconnecting oil/gas casings and supplementing SF6 but also avoids some secondary faults and risks, such as SF6 leakage.
出处 《水力发电》 北大核心 2014年第6期88-90,共3页 Water Power
关键词 试验 油气套管 变压器 桃源水电站 test oil/gas casing transformer , Taoyuan Hydropower Station
  • 相关文献

参考文献5

  • 1DL/T596-1996.电力设备预防性试验规程[S].[S].,..
  • 2陈化刚.电力设备预防性试验方法及诊断技术[M].北京:中国科学技术出版社,2001.
  • 3DL/T 838-2003,发电企业设备检修导则[S].
  • 4电力技术监督导则,DL/T1051-2007[S].
  • 5DL/T1054-2007.高压电气设备绝缘技术监督规程[S].

共引文献330

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部