期刊文献+

Calculation of slope-cover height under price fluctuation in open-pit mines 被引量:1

Calculation of slope-cover height under price fluctuation in open-pit mines
下载PDF
导出
摘要 Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine; in addition to an increasing price index, the slope cover height can be reduced; and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine. Leaving ditches between adjacent mining areas can effectively reduce re-stripping in the latter mining area and simultaneously lead to an increment in internal dumping costs in the former mining area. This paper establishes calculation models for these two marginal costs. The optimizing model for slope cover height can be determined by including marginal cost models in the objective function. The paper has two main contributions:(a) it fully considers redistribution of dumping space in the model;(b) it introduces price fluctuations and cash discounts in the model. We use the typical open-pit mine as an example to test and prove the model. We conclude that a completely covered slope is reasonable in Haerwusu open pit mine;in addition to an increasing price index, the slope cover height can be reduced;and that price changes are one of the most important influencing factors of slope cover height optimization in an open-pit mine.
出处 《International Journal of Mining Science and Technology》 SCIE EI 2014年第3期293-297,共5页 矿业科学技术学报(英文版)
基金 the key project of the National Natural Science Foundation of China (No. 51034005) the Research Fund for the Doctoral Program of Higher Education of China(No.20100095110019) the National‘‘Twelfth Five-Year’’Plan for Science and Technology Support of China(No.2014BAC14B00) the National High Technology Research and Development Program of China(No.2012AA062004)
关键词 计算模型 价格波动 完全覆盖 露天矿 边坡 边际成本 优化模型 目标函数 Open pit Slope cover height Transport costs Re-stripping
  • 相关文献

参考文献9

二级参考文献61

共引文献116

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部