1R.K.Cheung , D.D.Hang. A Time-window Sliding Procedure for Driv- er-task Assignment with Random Service Times [J]. liE Transactions, 2003, (35).
2R.K.Cheung, D.Xu, Y.Guan. A Solution Method for a Two-dispatch Delivery Problem with Stochastic Customers [J]. Journal of Mathemati- cal Modelling and Algorithms, 2007, (6).
3J.R.Birge , F.V.Louveaux. Introduction to Stochastic Programming [M]. New York : Springer Verlag, 1997.
4A.J.Kleywegt, A.Shapiro, T.Homem-de-Mello. The Sample Average Approximation Method for Stochastic Discrete Optimization [J]. SIAM Journal on Optimization, 2001, (12).
5S. S.Liu, C. J.Wang, Resource-constrained Construction Project Scheduling Model for Profit Maximization Considering Cash Flow [J]. Automation in Construction, 2008, 17(8).
1Dixit A K, Pindyck R S. Investment Under Uncertainty[M]. Princeton: Princeton University Press, 1994.
2Trigeorgis L. Real Options[M]. Cambridge: The MIT Press, 1996.
3Smets F. Exporting Versus FDI: Effect of Uncertainty Irreversibilities and Strategic Interactions, Working Paper, Yale University, 1991.
4Grenadier S. Option Exercise Games: An application to the equihbrium investment strategies of firms[J]. The Review of Financial Studies, 2002, 15 (3): 691-721.
5Weeds H. Strategic delay in real option model of R&D competition[J]. Review of Economic Studies, 2(302, 69: 729-747.
6Yang Ming, Li Chulin. Valuing investment project in competitive environment[J]. Discrete and Continuous Dynamical Systems,2003, An Supplement Volume: 941-946.
7Harrison J M. Brownian Motion and Stochastic Flow Systems[M]. New York: John Wiley and Sons, 1985. 11-14, 34.
8Sarkar S. On the investment-uncertainty relationship in a real options model[ J]. Journal of Economic Dynamics & Control, 2000, 24 (2): 219-225.
9Bodie Z, Kane A, Marcus A J. Investments[M]. Boston: Irwin McGraw-Hill, 1996. 185.
10Rhys H, Song J H, Jindrichovska I. The timing of real option exercise: Some recent development[J]. The Engineering Economist, 2002, 47(4): 436-450.
2AN Yan, WANG Jin-feng, FENG Li-jie, et al. Research on evaluation index system for efficiency of coal production logis- tics based on DEAF C3. 2009 International Conference of Management Engineering and Information Technology, 2009: 158 -161.
3LIU Guo-yu, LUO Chuan-long. Analysis of the safety psychological factors in the coal mine safety management[J]. Pro- cedia Engineering,2012,45:253 - 258.
4Sumit Mitra, Pablo Garcia-Herreros, Ignacio EGrossmann. A novel cross-decomposition nmhi-cut scheme for two-stage stochastic programming[J].Computer Aided Chemical Engineering,2014,33 : 241 - 246.