F级联合循环机组主厂房布置方案研究 被引量:1

Design Analysis of Main Building of Class F Combined Cycle Power Plant
下载PDF
导出
摘要 主厂房是联合循环电厂的核心建筑,因此主厂房布置方案是设计优化的重点。联合循环机组布置设计出发点不同,主厂房方案也会有所不同。本文以燃气轮机布置方式分析为出发点,结合某F级联合循环机组的设计投标成果,提出了两种不同的主厂房方案,并对其特点和指标进行了分析,为同类型工程的设计优化工作开拓了思路。 The main building is the core building of a combined cycle power plant, the layout design of which is usually the key point of optimizing design work. Since there are different design concepts, the main building layout has different plans. Started by analysis of gas turbine layout plans, this article puts forward two main building plans of a class F combined cycle power plant on the basis of design bidding achievement, and analyzes the feature and indexes, which supply more valuable concept for optimizing work of similar project.
作者 闫红亮
出处 《价值工程》 2014年第18期36-38,共3页 Value Engineering
关键词 联合循环 F级燃机 主厂房布置 设计优化 combined cycle Class F gas turbine main building layout optimizing design
  • 相关文献

参考文献6

二级参考文献16

共引文献43

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部