跨流域调水对电站装机容量选择的影响

Discussion the Influence of Inter Basin Water Transfer on Power Plant Installed Capacity Selection
下载PDF
导出
摘要 水资源短缺已成为制约新疆某些地区工农业生产发展的主要因素之一,因此跨流域调水就成为缓解水资源短缺地区供需水矛盾最有效的方法之一。然而调水工程的实施,会对调水工程本身产生一定的影响,从调水工程的调水量及水库的运行方式出发,探讨跨流域调水对电站装机容量选择的影响。 Water resources shortage has become one of the main factors to restrict the development of industrial and agricultural production in some areas of Xinjiang, therefore the inter basin water transfer has become one of the most effective methods to alleviate the contradiction between supply and demand of the area where water resource shortage. However, the implementation of the water transfer project, water transfer project itself will produce certain effect. In this paper , the influence of inter basin water transfer on power plant installed capacity selection is discussed in the view of the water diversion and operation mode of reservoir.
作者 吴萌
出处 《水利科技与经济》 2014年第4期131-134,共4页 Water Conservancy Science and Technology and Economy
关键词 调水工程 装机容量 电站 water transfer project installed capacity power station
  • 相关文献

参考文献5

  • 1电力部成都勘测设计研究院.水能设计[M].成都:电力部成都勘测设计研究院,1980.
  • 2欧军利,张军进.伊犁河流域规划要点报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2002.
  • 3顾春利,王洪亮.艾比湖流域生态环境保护工程一期工程项目建议书[R].天津:中水北方勘测设计研究有限责任公司,乌鲁木齐:新疆水利水电勘测设计研究院,2008.
  • 4彭卫军,欧军利.伊犁喀什河吉林台一级水利枢纽工程可行性研究报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2001.
  • 5王洪亮,吴萌.伊犁喀什河吉林台二级水电站引水发电系统工程可行性研究报告[R].乌鲁木齐:新疆水利水电勘测设计研究院,2006.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部