摘要
对银川河东机场三期扩建工程供电现状及用电负荷增长进行分析,提出了河东机场三期扩建工程供电的合理建设规划。结果表明:该方案既解决机场供电线路和净空限高之间的矛盾,又避免了对机场自然保护区林带的破坏。
Analyzes the power supply status quo and power load increasing of phase 3 extension project in Yinchuan Hedong Airport,puts forward the reasonable power supply construction scheme of phase 3 extension project in Yinchuan Hedong Airport. The result shows that the scheme not only solve the inconsistency between power supply transmission line and headroom height limit but also avoid destroying forest belt in natural protection area of the airport.
出处
《宁夏电力》
2014年第2期29-31,55,共4页
Ningxia Electric Power
关键词
飞机场
供电规划
电网建设
airport
power supply layout
power grid construction