摘要
针对绥中发电有限责任公司俄制超临界800MW机组给水流量测点故障恢复后两流道给水流量定值偏差大的原因进行了剖析,并且结合俄制超临界直流锅炉给水控制系统的特点,提出了改进方案,这些方案的有效应用,将会避免类似故障的发生,为机组的安全稳定运行奠定基础。
In this paper, analysis causes to Russian 800MW unit 's big deviation of two part water flow, and combination of the characteristics of Russian 800MW unit,puts forward a series of improvement program,effective avoid similar of failure,for the safe and stable operation of the unit to lay the foundation.
出处
《神华科技》
2014年第3期60-62,共3页
Shenhua Science and Technology