期刊文献+

应用于东辛油田的堵—固一体化工艺 被引量:1

PLUGGING-CEMENTING INTEGRATED TECHNOLOGY APPLIED IN DONGXIN OILFIELD
下载PDF
导出
摘要 为解决东辛油田部分套窜井、出砂井封堵有效期短(甚至封不住)问题,采用堵—固一体化工艺治理不同区块的6口高含水油井,施工成功率为85.7%,有效率为83.3%.目前,正常生产的5口井恢复产能21.6 m3/d,累计增油5 664.5 m3,最长有效期已超过554 d且继续有效.堵—固一体化工艺具有货源广、成本低、有效期较长等特点,为同类井的治理提供了可借鉴的经验. In the light of the problem of the short validity of the plugging ( even cannot be sealed) for some casing- channeled wells and sand producers in Dongxin Oilfield, the plugging-cementing technology is adopted and stimula- ted for six high-water-cut oil wells, the success rate of the operation is up to 85.7%, the effective rate reaches 83.3%. Up to now, the productivity of the normally produced 5 wells has recovered to 21.6m3/d, and the cumula- tive incremental oil is up to 5 664.5 m3 , the longest validity reaches more than 554 days, and moreover continue to be effective. The technology is characterized by wider supply of raw materials, lower cost, longer validity and so forth, and furthermore the successful application of the the technology has provided valuable experiences for the stimulation of the similar kind of the wells.
出处 《大庆石油地质与开发》 CAS CSCD 北大核心 2014年第3期114-117,共4页 Petroleum Geology & Oilfield Development in Daqing
关键词 堵—固一体化 工艺 东辛油田 plugging-cementing integration technology Dongxin Oilfield
  • 相关文献

参考文献20

二级参考文献78

共引文献133

同被引文献20

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部