期刊文献+

考虑风电并网的发电充裕度评估方法的比较 被引量:10

Comparison of adequacy evaluation methods considering grid-connected wind power
下载PDF
导出
摘要 介绍了解析法、状态抽样法、状态持续时间抽样法3种可靠性评估方法的原理;提出了解析法和状态抽样法中考虑风电机组随机停运时的风电场建模方法,并与状态持续时间抽样法中的相应建模方法进行了比较;分别采用3种方法对风电接入前后RBTS和IEEE RTS79系统的发电充裕度指标进行了计算。算例分析表明,在风电机组独立停运的假设下,风电机组的强迫停运率对系统发电充裕度的影响较小;3种发电评估方法评估结果接近,其中状态持续时间抽样法具有便于计入风电机组强迫停运率、风电接入后系统的评估时间不会显著增加等特点,更适合进行风电并网后的大规模电力系统的可靠性评估。 Three reliability evaluation methods are introduced in principle:analytical method,state sampling method and state duration sampling method. The modeling methods of wind farm with random outage are proposed for the analytical method and state sampling method,which are compared with that for the state duration sampling method. Three methods are respectively applied to calculate the generation adequacy indexes of RBTS and IEEE RTS79 systems with and without wind farm. Case analysis shows that,on the assumption of independent outage of wind turbine,the impact of its FOR(Forced Outage Rate) on the generation adequacy indexes is small;the results calculated by three methods are approximately equal;the state duration sampling method is more suitable for the reliability evaluation of large-scale power system with wind farms due to its easy integration of wind turbine FOR and insignificant increase of calculation load.
出处 《电力自动化设备》 EI CSCD 北大核心 2014年第6期30-35,共6页 Electric Power Automation Equipment
基金 江苏省教育厅自然科学基金资助项目(11KJB470007 11KJB470008) 南京工程学院科研基金资助项目(QKJA2011003)~~
关键词 解析法 状态抽样 状态持续时间抽样 风电 可靠性 analytical approach state sampling state duration sampling wind power reliability
  • 相关文献

参考文献19

  • 1HOSSEINPOUR M,MASHHADI H R,HAJIABADI M E. A new probabilistic model for wind farms in reliability assessment of a power system[J]. Journal of Zhejiang University-SCIENCEC, 2013,14(6) :464-474.
  • 2KARKI R,DHUNGANA D,BILLINTON R. An appropriate wind model for wind integrated power systems reliability evaluation considering wind speed correlations[J]. Applied Sciences,2013 (3) :107-121.
  • 3姜文,严正,杨建林.基于解析法的风电场可靠性模型[J].电力自动化设备,2010,30(10):79-83. 被引量:15
  • 4VALLEE F,BRUNIEAU G,PIRLOT M,et al. Optimal wind clus- tering methodology for adequacy evaluation in system generation studies using nonsequential monte carlo simulation [J]. IEEE Transactions on Power Systems, 2011,26(4) : 2173-2184.
  • 5BILLINTON R,YI G. Muhistate wind energy conversion system models for adequacy assessment of generating systems incorpo- rating wind energy[J]. IEEE Transactions on Energy Conversion, 2008,23 ( 1 ) : 163-170.
  • 6VALLEE F,LOBRY J,DEBLECKER O. Application and com- parison of wind speed sampling methods for wind generation in reliability studies using non-sequential Monte Carlo simulations [J]. European Transactions on Electrical Power,2009,19 (7):1002-1015.
  • 7吴林伟,张建华,刘若溪.考虑风电机组故障的风电场可靠性模型及其应用[J].电力系统自动化,2012,36(16):31-35. 被引量:33
  • 8张硕,李庚银,周明.含风电场的发输电系统可靠性评估[J].中国电机工程学报,2010,30(7):8-14. 被引量:50
  • 9栗文义,张保会,巴根.风能大规模利用对电力系统可靠性的影响[J].中国电机工程学报,2008,28(1):100-105. 被引量:59
  • 10张宏宇,印永华,申洪,梁双,王皓怀.基于序贯蒙特卡洛方法的风电并网系统调峰裕度评估[J].电力系统自动化,2012,36(1):32-37. 被引量:51

二级参考文献86