摘要 不确定因素处理方法的合理性将会直接影响配电网变电站规划的最优结果。在全寿命周期成本理论的基础上,改进了变电站的选址定容模型中不确定因素的量化处理方法,计入负荷、电价和土地价格的不确定性,建立以全寿命周期成本最低为目标函数的变电站规划模型。算例分析验证了所提规划方法的合理性,与传统规划方法相比,采用所提方法的全寿命周期成本较低,经济性更好。 The rationality of uncertainty factor treatment will directly influence the optimal result of distribution substation planning. Based on the theory of LCC(Life Cycle Cost),an improved quantization method is proposed for the uncertainty factors in the model of substation locating and sizing,such as load,electricity price and land price,and a substation planning model is built with the minimum LCC as its objective function. Case analysis verifies the rationality of the proposed method,which has lower LCC than traditional planning method does.
出处 《电力自动化设备》 EI CSCD 北大核心 2014年第6期141-145,167,共6页 Electric Power Automation Equipment
关键词 配电网 变电站 规划 全寿命周期成本 变电站选址定容 风险 electric power distribution electric substations planning life cycle cost substation locating and sizing risks
  • 相关文献

参考文献14

二级参考文献110

共引文献132

同被引文献218

引证文献15

二级引证文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部