摘要
结合南堡35-2CEP平台和西江23-1FPSO两个项目,简要介绍了同种燃油主机设备布置和管线设计过程中经验,同时提出了几点个人的建议。
Based on NB35-2 CEP and XJ23-1 FPSO two projects, some piping design and equipment layout experiences of the same oil generator were introduced, and some suggestions were put forward.
出处
《辽宁化工》
CAS
2014年第5期613-614,共2页
Liaoning Chemical Industry
关键词
主机
设备布置
管线布置
standardization
piping design
oil generator