锦屏一级水电站高落差垂直竖井GIL安装与试验 被引量:2

Installation and Test of GIL in High Drop Vertical Shaft for JinpingⅠHydropower Station
下载PDF
导出
摘要 锦屏一级水电站550 kV气体绝缘金属封闭输电线路(GIL)是目前国内该电压等级下安装海拔最高(海拔1 885 m)、垂直竖井形式、垂直安装落差高达225 m、总长度达3 376 m、输送容量大的工程项目。其设备布置、竖井安装的复杂性和高难度在国内少有。介绍了其布置与结构特点、垂直竖井中的安装方法、交流耐压试验,建议合理划分SF6气室,严格控制安装工艺,安装内置超高频局放探头,交流耐压时增加老练时间等,为同类工程的设备选型及安装提供参考。 550kV Gas insulated metal enclosed transmission line (GIL) project for the Jinping Ⅰ hydropower station is an engineering project with the 500kV voltage level at home at present,vertical shaft,the vertical installation height 225m,total length 3376m,large transmission capacity and the maximum height above sea level. Installation in vertical shaft is more difficult and complicated at home. This paper discusses mainly its structural characteristics, field installation method in vertical shaft as well as field AC withstand voltage test. Reasonably dividing SF6 chambers,strictly controlling installation procedures,Built-in Partial discharge couplers and increasing time of aging test are put forward. This project can be used for reference in the equipment selection and installation of other similar projects.
作者 杨晓玲
机构地区 锦屏水力发电厂
出处 《机电工程技术》 2014年第5期143-146,共4页 Mechanical & Electrical Engineering Technology
关键词 GIL 垂直竖井 高落差 锦屏一级水电站 GIL vertical shaft high drop Jinping I hydropower station
  • 相关文献

参考文献5

二级参考文献17

  • 1G.Schoeffner,T.Neumann.气体绝缘管道输电线和气体绝缘组合电器在电厂中的应用[J].电力建设,2004,25(6):4-7. 被引量:21
  • 2杨百军.SF6 CGIT在岭澳核电站的应用[J].水电电气,2002,(1):118-124.
  • 3桑志强,康本贤,阮全荣,马仲鸣,等.800kV GIL工程设计[A].第二届水力发电技术国际会议论文集[C].北京:中国电力出版社,2009:409-416.
  • 4AZZ/CGIT.安装与操作手册800kV SF6 GIL拉西瓦电站项目[K].波士顿:AZZ/CGIT公司.
  • 5Y Watanabe, S Moil et al. Construction of First Gas Insulated Transmission Line in Japan[J]. IEEE Trans. PAS, 1981, PAS-100 (10): 4319-4329.
  • 6Thomas Hillers, et al. Gas Insulated Transmission Lines[J]. IEEE Power Engineering Review, 2000(9) : 15-16.
  • 7IEC 61640-1998,Rigid high-voltage, gas-insulated transmission lines for rated voltage of 72.5 kV and above [ S ].
  • 8压缩气体绝缘输电管道系统[R].美国CGIT Westhoro公司,2004.
  • 9ALTER J, AMMANN M, BOECK W, et al. N2/SF6 gas-insulated line of a new GIL generation in service [ C ]//CIGRE, 2002:21-204.
  • 10Influence of GIL and cable to power system[ R ]. CGIT Westhoro Company of USA, 2004.

共引文献109

同被引文献21

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部