摘要 某高层建筑核心筒外框由16根钢管柱组成,外框钢管柱下为人工挖孔桩基础。地下室第1节钢管柱混凝土浇筑完毕后,经抽芯检测发现,3根钢管柱芯样靠近柱底部分的密实度与强度不够,需要进行重新处理。通过原因分析和方案对比,最终确定选用混凝土柱局部置换加固方案。详细介绍了置换加固方案的计算、材料选用、加固流程和注意事项。加固结果满足设计和施工要求。 The core tube frame of a super high-rise building was consisted with sixteen steel tube columns, and the steel tube' s basement is manual hole digging pile. After the first steel tube concrete pouring and sampling testing, the compactness and strength of three concrete filled steel tube column is lower and need to handle. By the reason analysis and scheme comparison, the partial replacement and strengthening on concrete filled steel tube column was adopted. Authors introduced the calculation, material selection, strengthening process and attentions of scheme. The strengthening effect can meet the requirement.
出处 《施工技术》 CAS 北大核心 2014年第10期46-49,共4页 Construction Technology
关键词 高层建筑 加固 置换 混凝土 tall buildings strengthening replacement concrete
  • 相关文献

参考文献5

  • 1JGJ81-2002,建筑钢结构焊接技术规程[S].北京:中国建筑工业出版社,2003.
  • 2JGJ/T283-2012自密实混凝土应用技术规程[S].北京:中国建筑工业出版社,2012.
  • 3四川省建筑科学研究院.GB50550-2010建筑结构加固工程施工质量验收规范[S].北京:中国建筑工业出版社,2010.
  • 4.CECS207:2006高性能混凝土土应用技术规程[S].北京:中国计划出版社,2006.
  • 5四川省建筑科学研究院.GB50367-2006混凝土结构加固设计规范[S].北京:中国建筑工业出版社,2006.