基于N-1和负荷特性的配电网最大接入容量研究 被引量:12

The largest access capacities analysis of distribution grid based on N-1 and the load characteristics
下载PDF
导出
摘要 分析配电网自动化管理系统(open2000)监测数据,发现配电网线路平均负载率偏低,一些线路处于轻载或空载状态,配电网冗余度过高、整体利用率低,资源浪费,但同时又有部分配电网线路处于重载状态,不满足N-1准则要求,影响电网可靠运行。针对以上问题,研究出了基于N-1和负荷特性的配电网最大接入容量。对规范配电网线路接入的配电变压器总容量,使配电网经济运行、负载率合理,并满足N-1准则的要求有重要参考价值。同时也可作为对现有运行的配电网接入容量合理性的校验标准。 This paper analyzes the monitoring data of distribution automation management system (open2000) and finds that the average line load rate of distribution grid is low, some of the lines are in the light load or no-load condition, distribution grid redundancy is too high, the overall utilization is low, and the resource is wasted, but while there are parts of the distribution grid line is overloaded, which can not meet the N-1 standard requires and affect the grid reliable operation. To solve the above problems, this paper develops the maximum distribution grid access capacities based on N-I and load characteristics. It has important reference value to regulate the total capacity of distribution transformer accessing distribution line, guarantee economic operation of distribution grid and reasonable load rate, and meet the requirements of N-1 criterion. It also can be regarded as a calibration standard for access capacity rationality of existing distribution grid.
出处 《电力系统保护与控制》 EI CSCD 北大核心 2014年第12期126-130,共5页 Power System Protection and Control
关键词 N-1 负荷特性 负载率 配电网 最大接入容量 N-1 load characteristics load factor distribution grid maximum access capacity
  • 相关文献

参考文献19

二级参考文献167

共引文献358

同被引文献118

  • 1石海钦.变压器并列运行造成全厂停产事故分析[J].电气技术,2008,9(6):66-69. 被引量:3
  • 2USCA. Final report on the August 14, 2003 blackout in the United States and Canada, US-Canada Power System Outage Task Force[R]. 2004.
  • 3UTCE. Final report system disturbance on 4 November 2006, union for the co-ordination of transmission of Electricity[R]. 2007.
  • 4NERC. Standard TOP-004-2: transmission operations, North American Electric Reliability Corporation[R]. 2007.
  • 5WSCC Operations Committee. Western Systems Coordinating Council disturbance report For the power system outages that occurred on the western interconnection on July 2, 1996 and July 3, 1996, Western Systems Coordinating Council[R]. 1996.
  • 6KAUFFMAN S. At home in the universe: the search for the laws of self-organization and complexity[M]. New York: Oxford University Press, 1996.
  • 7EPPSTEIN M, PAYNE J, WHITE B, et al. Genomic mining for complex disease traits with random chemistry[J]. Genet Program Evolv Special Issue on Medical Applications, 2007, 8:395-411.
  • 8PFITZNER R, TURITSYN K, CHERTKOV M. Controlled tripping of overheated lines mitigates power outages[J]. 2011.
  • 9DAVIS C M, OVERBYE T J. Multiple element contingency screening[J]. IEEE Transactions on Power Systems, 2011, 26(3): 1294-1301.
  • 10EJEBE G, WOLLENBERG B. Automatic contingency selection[J]. IEEE Transactions on Power Apparatus and Systems, 1979, 98(1): 97-109.

引证文献12

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部