期刊文献+

Nash瞬时单位线推演河道汇流的完整公式 被引量:11

Complete formula of river flow routing based on Nash instantaneous unit hydrograph
下载PDF
导出
摘要 Nash瞬时单位线是基于零初始条件而得到的,没有反映河道汇流的完整过程。通过拉普拉斯变换和数学归纳,推导出了考虑初始槽蓄量退水过程的完整Nash河道汇流公式。分析讨论了公式各项的物理含义,出口断面的流量应是河槽初始槽蓄量的退水过程与上游入流演算结果的叠加,据此建立了一种具有物理概念的河道洪水演算实时校正模型,通过实例分析验证了公式的实用性和合理性。完整公式是更为一般情形下的Nash河道汇流模型,一定程度上丰富和发展了现有Nash汇流理论,并可适当提高河道洪水演算的精度。 Nash Instantaneous Unit Hydrograph (NIUH) is based on the assumption of zero initial conditions which is unable to represent river flood routing in real situation. The complete formula of NIUH for river flood routing which includes initial channel storage recession flow was deduced by the Laplace transform and mathematical induction. The physical meaning of each item of the complete formula was analyzed and discussed. It is demonstrated that outflow is composed of two portions: One is the recession of the initial channel storage, the other is the inflow routed through the channel. A real-time updating approach of the river flood routing was proposed based on the complete formula. The practicability and rationality of the formula were verified through the case study. The complete formula can be considered to be a more general case of the Nash river flood routing model. It is a development of the existed NIUH theory and can adequately improve the accuracy of the river flood routing.
出处 《水科学进展》 EI CAS CSCD 北大核心 2014年第3期428-434,共7页 Advances in Water Science
基金 长江科学院开放研究基金资助项目(CKWV2012302/KY) 国家自然科学基金资助项目(51109085)~~
关键词 河道洪水演算 Nash瞬时单位线 退水流量 实时校正 非零初始条件 river flood routing Nash instantaneous unit hydrograph recession flow real-time updating non-zero initial conditions
  • 相关文献

参考文献8

  • 1芮孝芳,刘宁宁,凌哲,梁霄.单位线的发展及启示[J].水利水电科技进展,2012,32(2):1-5. 被引量:14
  • 2LI C, GUO S, ZHANG W, et al. Use of Nash's IUH and DEMs to identify the parameters of an unequal-reservoir cascade IUH model [J]. Hydrological Processes, 2008, 22: 4073-4082.
  • 3CHOI Y J. Estimation of the Nash model parameters based on the concept of geomorphologic dispersion [ J]. Journal of Hydrologic Engineering, 2011, 16(10) : 806-817.
  • 4倪浩清.瞬时单位线问题的分析.水利学报,1980,.
  • 5华士乾,文康.论流域汇流的数学模型[J].水利学报,1980(5):1-12.
  • 6JENG R I, COON G C. True form of instantaneous unit hydrograph of linear reservoirs [ J]. Journal of Irrigation and Drainage Engi- neering, 2003, 129: 11-17.
  • 7孙颖娜,芮孝芳.随机输入情况下汇流计算方法的探讨[J].水科学进展,2005,16(5):661-665. 被引量:11
  • 8庄一鸽 林三益.水文预报[M].北京:水利电力出版社,1986..

二级参考文献20

  • 1芮孝芳,蒋成煜.流域水文与地貌特征关系研究的回顾与展望[J].水科学进展,2010,21(4):444-449. 被引量:23
  • 2冯平,朱元.流域汇流的线性随机动力系统的探讨[J].成都科技大学学报,1996(4):6-12. 被引量:2
  • 3DOOGE J C I.Linear theory of hydrologic systems[M].Washington D.C.:USDA,1973.
  • 4CHOW V T.Handbook of applied hydrology[M].New York:McGraw-Hill,1964.
  • 5CLARK C O.Storage and the unit hydrograph[J].Transactionsofthe American Society of Civil Engineers,1945,110:1419-1446.
  • 6JOHNSTONE D,CROSS W P.Elements of applied hydrology[M].New York:Ronald Press,1949.
  • 7CHOW V T,KULANDAISWAMY V C.General hydrologicsystem model[J].Journal of the Hydraulics Division,ASCE,1971,97(HY6):791-804.
  • 8RODRIGUEZ-ITURBE I,VALDES J B.The Geomorphologicstructure of hydrological Response[J].Water ResourcesResearch,1979,16(6):1409-1420.
  • 9LINSLEY R K,KOHLER M A,PAULHUS J L H.Hydrologyfor Engineers[M].New York:McGraw-Hill,1982:223-225.
  • 10NASH J E.A unit hydrograph study,with particular referenceto British catchments[J].Proceedings ofthe Institution of CivilEngineers,1960,17:249-282.

共引文献32

同被引文献96

引证文献11

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部