摘要 蒸汽发生器(SG)管板组件深孔钻是SG制造过程中的关键工艺,也一直是制造过程中的难点之一。三门核电厂AP1000机组SG管板较之二代加核电机组的管板厚度增加,管板钻孔难度也随之增加。本文介绍了三门核电厂2号机组SG管板3个孔钻偏问题的处理,期望在后续SG制造过程中,能够从中吸取经验教训,避免类似问题的出现。 Deep hole drilling of steam generator tube sheet assembly is an important process for SG fabrication. This process is always difficult during manufacturing. The SG Tube sheet of Sanmen AP 1000 Units is thicker than that of Nuclear Power Generate II+. The difficulty of Tubesheet Drilling also grows with the larger thickness. This paper describes the disposition of SG Tube sheet drilling deviation for Sanmen Nuclear Power Plant Unit 2. It is expected to provide some useful experience for the future SG manufacturing, avoiding such problem occurs again.
出处 《核动力工程》 EI CAS CSCD 北大核心 2014年第3期76-79,共4页 Nuclear Power Engineering
关键词 AP1000 蒸汽发生器(SG) 管板 钻孔 偏差 AP1000, Steam generator, Tube sheet, Drilling, Deviation
  • 相关文献

参考文献1

  • 1美国机械工程师协会(ASME)第ⅡI卷[S].核设施建造规则NB分卷1998版+2000增补.

同被引文献22

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部