长春远达大街跨越长春东站立交桥钢箱梁架设施工技术 被引量:7

Construction Technology on Steel Box Girder Erection of Changchun Yuanda Street Crossing Overpass Bridge of Changchun East Station
下载PDF
导出
摘要 结合长春市东纵远达大街跨越长春东站立交桥钢箱梁架设安装工程,着重阐述了在城市复杂条件下桥梁架设施工方法,并介绍了方案选择,顶推台座、牵引系统、滑动和纠偏系统、导梁等的设计和布置方法,可为今后同类型桥梁的设计和施工提供借鉴。 Combination of overpass bridge steel box girder erection and installation engineering in Changchun East Longitudinal Yuanda Street crossing the Changchun East station, this paper emphatically elaborated bridge erection method under the complex conditions in the city, and introduced the scheme selection, pushing pedestal, traction system, design and arrangement of sliding and correction system, guiding beam. This can provide references for the design and construction of the same type bridge in the future.
作者 何映春
出处 《铁道建筑技术》 2014年第6期24-28,共5页 Railway Construction Technology
关键词 连续钢箱梁 桥梁架设 钢梁划分 continuous steel box girder bridge erection steel girder division
  • 相关文献

参考文献1

  • 1作岳.连续梁桥[M].北京:人民交通出版社,2012.

同被引文献29

引证文献7

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部