盾构的平移解体技术 被引量:15

Translation and Disintegration Technology of Shield
下载PDF
导出
摘要 城市地铁盾构机接收井往往受地面条件或地下管线的限制,不具备盾构主机直接起吊条件,需要将盾构主机整体平移、调头或分体后平移,到达吊出口后吊出的目的。以南昌地铁一号线6标彭家桥站~师大南路站左线盾构机在师大南路站解体吊出为例,对盾构主机的整机调头、平移及解体进行了系统介绍,对盾构主机的平移和解体方案及实施进行了详细论述,值得借鉴和推广。 Due to city subway shield machine receiving wells often restricted by ground conditions or underground pipelines, the host machine does not have the shield directly lifting conditions, it is necessary to move the host machine as a whole and turn around or translate it after spliting, so as to shift the machine out of the well. This paper, taking the shield machine disintegration and hanging out in the station of Pengjiaqiao to south Road of Normal University of Lot 6 of Nanchang Metro Line No. 1 left line as an example,introduces the translation of shield host and the disintegration of the plan and implement in detail, it is worthy learning and promotion.
作者 黄云生
出处 《铁道建筑技术》 2014年第6期53-56,共4页 Railway Construction Technology
关键词 盾构接收 方案确定 平移解体技术 shield reception scheme determination translation and disintegration technology
  • 相关文献

同被引文献97

引证文献15

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部