官地水电站拦河大坝上游围堰设计

Design of Guandi Hydropower Station Weir Dam Upstream Cofferdam
下载PDF
导出
摘要 官地水电站上游围堰最大堰高55m,总填筑方量约100万m3,结合工程实例及现场情况确定为斜墙土石围堰,防渗型式采用复合土工膜与封闭式防渗墙。在施工阶段由于现场料源问题,采用土工格栅加筋设计,计算及实践证明了设计的合理性和安全性,可以为其他类似工程借鉴。 Guandi Hydropower Station upstream cofferdam has maximum height of 55m.Total filling quantity is 1 million cubic metres.Project examples and site conditions are combined for determining the project as sloping core earth-rock cofferdam.Composite geomembrane and closed type cut-off wall are adopted as impermeable model.Geogrid reinforced design is adopted during the construction stage due to on-site source material problem.Design rationality and security are proved by calculation and practice,thereby providing reference for similar projects.
出处 《中国水能及电气化》 2014年第5期63-66,15,共5页 China Water Power & Electrification
关键词 官地水电站 上游围堰 土石围堰 复合土工膜 土工格栅 Guandi Hydropower Station upstream cofferdam earth-work cofferdam composite geomembrane geogrid
  • 相关文献

参考文献6

二级参考文献13

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部