武当山遇真宫保护顶升工程测量技术实践

Engineering Surveying Technology Practice for Yuzhen Palace Rising
下载PDF
导出
摘要 采用分步抬升施工方案,运用计算机同步液压顶升系统和常规精密高程测量方法,将遇真宫山门及两翼琉璃墙体、东西宫门实施原地顶升15 m,其顶升高度为目前世界纪录的5倍,创造了世界建筑工程顶升史上的奇迹。主要介绍了遇真宫顶升工程技术方案、精密顶升测量及最终高度定位测量技术和方法,为我国开展建筑工程高难度顶升及测量提供了宝贵经验。 Applied the methods and technology of the synchronized rise system controlled by computer and high accurate measurement, carrying out the scheme of stage-by-stage rise, the Yuzhen Palace had been put up from the height of 160 m to 175 m successfully. The difference of elevation is up to 5 times of the world record of architecture rising at present. This paper focused on the methods and technology of rise-up program as well as measurement of architecture rise and location of height surveying. The project was believed the great works and can offers an example of reference.
出处 《地理空间信息》 2014年第1期144-146,12,共3页 Geospatial Information
关键词 遇真宫 分步抬升施工 精密顶升测量 高度定位测量 Yuzhen Palace,rise stage by stage,measurement of architecture rise,location of height surveying
  • 相关文献

参考文献6

  • 1CJJ/T73-2010.卫星定位城市测量技术规范[S].
  • 2CJJ/T 8.城市测量规范[S].
  • 3GB/T 12897-2006,国家一、二等水准测量规范[S].
  • 4GB12898-91,国家三四等水准测量规范[S].
  • 5GB50026-2007工程测量规范[S].
  • 6周忠谟.GPS卫星测量原理与应用[M].北京:测绘出版社,2004.

共引文献533

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部