摘要
在建筑工程施工的前期,土石方工程量计算是一个较为重要的工作。对方格网法、DTM法及区域土方量平衡法等3种土方计算法进行了介绍,并对其适用范围进行了研究。
At the early stages of the construction project, earthwork computations is one of the important works. This paper introduced three earthwork calculation methods such as grid method, DTM and area of earthwork balance, and discussed the ranges of application of these methods.
出处
《地理空间信息》
2014年第1期154-156,13,共3页
Geospatial Information