以六盘山隧道为例,详细介绍了在隧道大变形段落的监控量测实施过程,并对隧道围岩发生的大变形提出了针对性的加固处理方案,实践证明采用该加固处理措施非常有效,可以为类似的隧道施工提供借鉴。
The Liupanshan tunnel is taken as an example in this paper, and the content and process monitoring measurement of tunnels in large deformation paragraph is introduced in details, and the targeted reinforcement is proposed to deal with the large deformation of surrounding rock. Practice proved: the reinforcement measures works well, can provide reference for similar tunnel construction.
出处
《山西建筑》
2014年第18期199-201,共3页
Shanxi Architecture
关键词
大变形
监控量测
加固处理措施
large deformation
monitoring measurement
reinforcement measure