隧道大变形段落的监控量测与加固方案研究

Study on monitoring measurement and reinforcement of large deformation tunnel paragraph
下载PDF
导出
摘要 以六盘山隧道为例,详细介绍了在隧道大变形段落的监控量测实施过程,并对隧道围岩发生的大变形提出了针对性的加固处理方案,实践证明采用该加固处理措施非常有效,可以为类似的隧道施工提供借鉴。 The Liupanshan tunnel is taken as an example in this paper, and the content and process monitoring measurement of tunnels in large deformation paragraph is introduced in details, and the targeted reinforcement is proposed to deal with the large deformation of surrounding rock. Practice proved: the reinforcement measures works well, can provide reference for similar tunnel construction.
作者 周建芳
出处 《山西建筑》 2014年第18期199-201,共3页 Shanxi Architecture
关键词 大变形 监控量测 加固处理措施 large deformation monitoring measurement reinforcement measure
  • 相关文献

参考文献3

二级参考文献7

  • 1杨会军,胡春林,谌文武,梁收运.断层及其破碎带隧道信息化施工[J].岩石力学与工程学报,2004,23(22):3917-3922. 被引量:65
  • 2[4]Nie X, Zhang Q. A system of monitoring and dimensioning tunnel support [ J ]. Rock Mechanics and Rock engineerins,1994, 27(1): 23 ~36
  • 3隧道局科研所.<内昆线曾家坪1号隧道施工监测总结报告>.2000.07.
  • 4隧道局科研所.<内昆线邓家湾1号隧道施工监测总结报告>.2000.05.
  • 5铁道部第二勘测设计院,西南交通大学.<内昆线大跨车站隧道预设计支护参数和施工方法的基本研究>.1998.01.
  • 6铁路隧道设计新奥法指南.北京:中国铁道出版社.1988.06.
  • 7王国梁.高速公路隧道施工监控量测[J].山西建筑,2009,35(31):320-321. 被引量:7

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部