在高校计算机机房建设中,布线是整个网络系统的重点。机房管理教师在布线之初必须做好前期的规划设计工作。为此,电源线和网络线的布设分为设计、施工、验收三个步骤,在保证系统高质量的前提下,兼顾其经济、美观、实用和安全性,为机房实践课的高效率提供有力保障。
In the construction of computer room in colleges, the layout of the power cord and network cable is the core of the whole network system. Before cabling, the work of design and plan needs to be done. In this paper the layout of power cords and network cable is divided into three steps: design, construction and acceptance. It makes the wiring of the computer room become economical, beautiful, practical, and secure as well as the quality is guaranteed. It ensures the high efficiency for the laboratory courses.