太中银铁路行车转线接触网过渡工程施工方案 被引量:2

The construction program of transition OCS for the train route line of Tai ZhongYing
下载PDF
导出
摘要 随着我国高速铁路建设的发展,在铁路的建设过程中,存在着大量的新建铁路施工和既有线路并列同时运行的情况,为不影响既有线路的正常运营,便促成了大量的接触网过渡工程要实施。文章就太中银铁路电气化过渡工程特殊性,过渡方法及总体的过渡施工方案做了详细的阐述。 with the development of Chinese high--speed railway construction, in the process of the railway construction, there will be a lot of situation such as the new railway construction project in accompany with the existing railway lane, in avoid of affecting the normal operation mode of the existing railway lane, so many OCS transition projects should be implemented. The text has done a detailed research based on the particularity of railway electrification, transition method and the general transition construction program for Tai ZhongYing Railway.
作者 郭忠宽
出处 《科技创新导报》 2014年第9期77-78,共2页 Science and Technology Innovation Herald
关键词 接触网 铁路电气化 既有线路 过渡方案 Overhead Contact Line System (OCS), Railway Electrification, Existing Railway Lane and Transition Construction Program
  • 相关文献

参考文献2

二级参考文献3

共引文献5

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部