摘要
合同变更与索赔管理是工程项目设备采购合同管理的重要内容。在处理具体合同变更与索赔时,采用定性和定量分析,能对具体情况进行有效分析,进而制定合适的执行方案,使合同管理工作操作性更强、效率更高的、风险更小。
The contract variation and claim are important contents of the equipment procurement contract management ofengineeringproject.Using the qualitative and quantitative analysisto analyze the specific situationof the contract variation and claim,and then make the appropriate scheme to deal with the contract variation and claim,the contract management will be much more operational,efficiency,and the risk will be smaller.
出处
《科技创新导报》
2014年第13期209-210,共2页
Science and Technology Innovation Herald
关键词
合同管理
定性
定量
变更
索赔
contract management
qualitative
quantitative
variation
claim