摘要
文章介绍了中厚板机组在市场需求不足的情况下,通过采用集中生产、提高工序匹配能力、减少设备故障时间等措施优化生产组织,实现降低燃动力,并在实际生产中取得了良好效果。
In the context of making plate overcapacity and market order is insufficient, through production process orga-nization, such as centralization production and improving the matching ability and reducing equipment down time .This measures reduced fuel powered and achieved good results in actual production.
出处
《新疆钢铁》
2014年第1期30-32,共3页
Xinjiang Iron and Steel
关键词
中厚板机组
生产组织
燃耗
电耗
plate unit
production organization
burnup power
consumption