期刊文献+

地铁下穿创业立交桥桩基托换施工技术研究 被引量:7

Study on Technology of Pile Foundation Underpinning Road Overpass in Subway Construction
下载PDF
导出
摘要 在城市轨道交通中,地下工程往往需要穿越上部建筑物,而城市中建筑物大多采用桩基础形式,隧道线路虽可进行局部的优化,但仍受规划和总体线路的限制,这样,进行桩基托换往往是最好的选择方案。以深圳地铁5号线创业路立交桥为例,详细介绍了创业路立交桥桩基托换的设计、三维数值分析、施工工艺、以及施工工程中监测数据的情况,可为类似的地铁施工提供全过程的借鉴。 During the urban rail transit construction , it is inevitable for the underground engineering to un-derpass the upper structures .While most of the construction adopt the pile foundation , though the line planning could be optimized , it is hard to change too much for limitation of the general planning and the general line plan-ning.So pile foundation underpinning is a good program for such constructions .In this paper, Chuangye Road overpass of Shenzhen Metro Line 5 is taken for study , it describes in detail the design , numerical analysis , con-struction techniques and the monitor data of the construction .It could be referenced for other such metro con-struction.
出处 《石家庄铁道大学学报(自然科学版)》 2014年第2期23-26,32,共5页 Journal of Shijiazhuang Tiedao University(Natural Science Edition)
关键词 轨道交通 桩基托换 数值分析 施工监测 pile foundation underpinning overpass numerical analysis civil construction
  • 相关文献

参考文献3

二级参考文献11

共引文献22

同被引文献49

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部