期刊文献+

软土地基处理方案的技术经济分析 被引量:3

Technical and economical analysis on the treatment programs of soft soil foundation
下载PDF
导出
摘要 结合井睦高速公路工程项目中的山涧淤泥质土-砂混合软土地基,通过采用松木桩、CFG桩和水泥深层搅拌桩对该软基进行处理,并对这3种软基处理方案进行技术比较与经济分析,以便得到最优处理方案.研究表明:松木桩的造价在3种处理方式中是最高的,而且松木桩受处理深度和承载力的限制,它不是最佳的选择方案;在相同的条件下,CFG桩法处理地基的造价是水泥深层搅拌法处理地基的1.4倍左右,造价较为昂贵;最终确定选用水泥深层搅拌桩法加固该工程的淤泥质土-砂混合软土地基. This paper is based on the mountain silt-sand mixed soft soil foundation of Jing-mu highway project. Through technical comparison and economic analysis of the treatment programs of the soft soil foundation about the Pine pile, the CFG pile (Cement Fly-ash Gravel Pile) and the Cement Deep Mixing pile are made so as to select the best treatment program. The study shows that the cost of the Pine pile is the highest among the three treatment programs of the soft soil foundation which is limited by the processing depth and the bearing capacity to be chosen as the best option. Under the same conditions, the cost of the CFG pile is so much expensive as to 1.4 times that of the cement deep mixing pile. Finally, cement deep mixing pile is chosen to handle the silt-sand mixed soft soil foundation in this project.
出处 《有色金属科学与工程》 CAS 2014年第3期96-101,共6页 Nonferrous Metals Science and Engineering
基金 江西省交通厅科技项目(2012C0003 2012C0004)
关键词 淤泥质土-砂混合软基 松木桩 CFG桩 水泥深层搅拌桩 技术经济分析 silt-sand mixed soft soil foundation pine pile CFG pile cement deep mixing pile technical and economic analysis
  • 相关文献

参考文献8

二级参考文献28

共引文献4029

同被引文献9

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部