期刊文献+

南京电网规划的不确定性分析及优化调整建议 被引量:3

Uncertainty analysis and optimization adjustment suggestion on Nanjing electricity power grid plan
下载PDF
导出
摘要 截至2012年年底,江苏省13个省辖市的500kV、220kV等各等级输变电电网规划环评已全面完成,从环保角度对后期输变电项目建设起到了很好的规划与指导作用。结合南京电网"十二五"发展规划环境影响评价,介绍了规划方案中的不确定因素,并给出了规划方案的优化调整建议,为规划环评中规划的不确定性分析及优化调整建议提供了有益的参考。 Up to the end of 2012,plan ElA of transmission electricity power grid including al levels of 500 kV and 220 kV has been finished completely in 13 municipalities in Jiangsu Province,which has played important roles in guiding and planning the fol owing projects of transmission electricity. Combined with the plan ElA during 12th Five-Year period of Nanjing electricity power grid,the uncertainty analysis of plan ElA was introduced,and the optimal adjustment of plan ElA was given. The results provide useful reference for future plan ElA.
出处 《电力科技与环保》 2014年第3期11-13,共3页 Electric Power Technology and Environmental Protection
基金 江苏省环保厅2012年度省级环保科研课题(2012074)
关键词 南京电网 规划环境影响评价 不确定分析 优化调整 Nanjing Grid plan environmental impact assessment uncertainty analysis optimal adjustment
  • 相关文献

参考文献5

二级参考文献26

共引文献55

同被引文献27

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部