摘要
介绍华蓥山隧道在施工过程中发生的涌突水、涌泥、涌砂情况 ,分析了其成因 ,介绍了施工过程中的应急整治措施 ,并对隧道涌突水。
The paper introduces the inflow of water, mud and sand occurred during the construction of Huayingshan Tunnel. Reasons for the inflow are analyzed and emergency treatment methods are put forward.
出处
《铁道建筑技术》
2001年第1期36-39,共4页
Railway Construction Technology