期刊文献+

铁路工务工作“九五”回顾和“十五” 展望

Review of the "Ninth Five-year Plan" Period and Prospect of the "Tenth Five-year Plan" Period for the Work of Railway Permanent Way
下载PDF
导出
摘要 回顾了“九五”期间工务工作取得的成绩及存在的主要问题,结合铁路运输体制改革的目标及工务工作面临的形势,提出了“十五”工务工作目标和意见。 The achievements and the main problems existed in the work of permanent way during the 'Ninth Five-year Plan' period are reviewed. In combination with the target for the railway transportation system reform and the situation faced with for the work of permanent way, the target and opinion for the work of permanent way during the 'Tenth Five-year Plan' period are put forward.
出处 《中国铁路》 北大核心 2001年第1期7-12,共6页 China Railway
关键词 铁路 工务部门 “十五”期间 工务工作 工作意见 permanent way work review opinion on work

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部