期刊文献+

Utilization of Data Communication according to the IEC61850 Standard for Nuclear Power Plant Electrical Equipment Testing 被引量:1

Utilization of Data Communication according to the IEC61850 Standard for Nuclear Power Plant Electrical Equipment Testing
下载PDF
导出
摘要 This paper deals with an integration of directly measured electrical parameters with data acquired by data communication from protections and terminals into an advanced monitoring system. Based on the periodic test, the authors of this paper present the possibility of an extended evaluation and more accurate analysis of transient and failure events. For periodical testing, as implemented during the commissioning of power plants in the Czech Republic, a monitoring system of electrical equipment has been used, to record the courses of important electrical parameters and thus, proving the proper functioning of complex technological systems in various operation modes. Data from monitoring system were used to prove the successful results of the test or as a base data for further analysis of failures. The monitoring system has proved itself as a very useful device also when recording unexpected failure events, the cause of which was very quickly and accurately detected by the follow-up analysis. Initially, only the voltage and current data from measuring transformers, analogue transducers and contact relays were used as input data for the monitoring system. After the implementation of new digital protection technology and controlling terminals with inner data recorder, the data from digital devices could be also utilized for the monitoring system.
机构地区 TES s.r.o.
出处 《Journal of Energy and Power Engineering》 2014年第4期765-769,共5页 能源与动力工程(美国大卫英文)
关键词 Power plant data communication emergency source TRANSIENT FAILURE TERMINAL electrical protection. IEC61850标准 数据通信 电气设备 核电厂 设备检测 利用率 监测系统 直接测量
  • 相关文献

参考文献6

  • 1O. Marecek, Annual Report on Project Implementation FR-TI3/016, Trebic, Czech Republic, 2011.
  • 2IEC 61850-5, Communication Networks and Systems for Power Utility Automation: Part 5: Communication Requirements for Functions and Device Models, International Electrotechnical Commission, Geneva, Switzerland, 2003, p. 138.
  • 3IEC 61850-6, Communication Networks and Systems for Power Utility Automation: Part 6: Configuration Description Language for Communication in Electrical Substations Related to IEDs, International Electrotechnical Commission, Geneva, Switzerland, 2010.
  • 4IEC 61850-7-1, Communication Networks and Systems for Power Utility Automation: Part 7-l: Basic Communication Structure--Principes and Models, International Electrotechnical Commission, Geneva, Switzerland, 2011, p. 294.
  • 5O. Marecek, M. Kaska, Utilization of digital protection and terminal communication for power plant electrical equipment testing, in: Conference on Diagnostics in Electrical Engineering CDEE 2013, Pilsen, Czech Republic, Sept. 2-4, 2013.
  • 6O. Marecek, Project FR-TI3/016, Stage El: Research on Utilization of Elements, Equipment and Systems for Electrical Facilities, Trebic, Czech Republic, 2012.

同被引文献9

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部