期刊文献+

邻近地铁旁的深基坑施工 被引量:6

Construction of Deep Foundation Ditch Neighboring Subway
下载PDF
导出
摘要 万象国际广场基坑外围距地铁边缘仅 3m ,且二者同步施工。施工中采取科学的工艺流程、多种技术措施和实现了信息化施工 ,使支护结构经受了地铁盾构顶进。 The distance between the exterior protection wall of foundation ditch of Wanxiang International Plaza and the side of subways is only 3 meters, and they were constucted at the same time. In the construction of Wanxiang International Plaza, many techniques such as scientific construction procedure and information alized construction were adopted to make the protection structure strong and bear such tests as subway shield driving, subway earthwork excavation and sustainer demolition blasting and so on.
作者 杨学清
出处 《施工技术》 CAS 北大核心 2001年第1期7-9,共3页 Construction Technology
关键词 深基坑 地下连续墙 信息化施工 工程施工 地铁 foundation pit supporting underground continuous wall earthwork excavation horizontal sustainer information alized constructiT
  • 相关文献

同被引文献57

引证文献6

二级引证文献220

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部