摘要
万象国际广场基坑外围距地铁边缘仅 3m ,且二者同步施工。施工中采取科学的工艺流程、多种技术措施和实现了信息化施工 ,使支护结构经受了地铁盾构顶进。
The distance between the exterior protection wall of foundation ditch of Wanxiang International Plaza and the side of subways is only 3 meters, and they were constucted at the same time. In the construction of Wanxiang International Plaza, many techniques such as scientific construction procedure and information alized construction were adopted to make the protection structure strong and bear such tests as subway shield driving, subway earthwork excavation and sustainer demolition blasting and so on.