摘要
文章简要阐述工程签证的重要性、适用范围和设计变更的区别和联系以及签证流程和作为建设单位加强签证管理应采取的措施。
The importance and scope of engineering visa was discussed which was different and related with design alternation. The measures should be taken to strengthen the management of engineering visa,too.
出处
《盐业与化工》
CAS
2014年第6期6-7,共2页
Jounral of Salt and Chemical Industry
关键词
工程签证
设计变更
签证流程
engineering visa
design alternation
process of engineering visa