摘要
利川汪营风电场装机容量为48 MW,安装2000 kW风力发电机组24台,塔架高度80 m,叶轮直径105 m。介绍了该厂风力发电机主要组成部件的安装实施过程及质量控制措施。
In the Wangying wind power station in Lichuan City , 24 wind turbine generator units are installed with the to-tal capacity of 48 MW.For each unit , the capacity is 2 000 kW, with the tower of 80 meters high and the impeller of 105 meters diameter .In this paper , the installation process and quality control measures of main components of the gen-erators are introduced .
出处
《水电与新能源》
2014年第6期73-75,共3页
Hydropower and New Energy
关键词
汪营风电场
风机吊装
质量控制
Wangying wind power station
wind turbine generator installation
quality control