川杨河大桥EPS总承包建设模式下的设计工作体会

Design Experience of Chuanyang River Bridge by EPS General Contracting Construction Model
下载PDF
导出
摘要 上海市沿浦路(现改名为耀龙路)跨川杨河大桥为上海市2010年世博会配套项目,采用EPC总承包模式建设,设计组在项目中发挥技术优势,设计工作与施工方案密切结合,真正发挥了设计的龙头作用,取得了既节省了工程建设费用,同时也加快了施工进度的满意成效。介绍了该桥设计施工总承包建设模式中的设计工作体会,有关经验可供相关专业人员参考。 The bridge crossing Chuanyang River in Yanpu Road(newly named as Yaolong Road) of Shanghai was the supporting project for Shanghai 2010 Expo,and was constructed by EPS general contracting model.The close combination of the design work and construction scheme plays the technical superiority in the project,and really plays the leading role of the design.The model achieves the satisfying effect not only economizing the engineering construction cost,but also speeding up the construction schedule.The article introduces the design experience of the general contracting model in the design and construction of this bridge.The relative experience can be referred for the similar bridges.
作者 齐新
出处 《城市道桥与防洪》 2014年第5期150-152,167,共4页 Urban Roads Bridges & Flood Control
关键词 设计施工总承包 拱桥 桥梁设计 general contracting of design and construction,arched bridge,bridge design
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部