摘要
为提高耙吸船施工生产率、降低施工成本,分析耙吸船施工数据,机具性能,进行土质采样试验,深入研究并优化耙吸船施工工艺。新的施工工艺实施后,天津港30万吨级航道耙吸船施工生产率提高了37%,加快了施工进度,节约了施工成本。
To improve the TSHD's construction productivity and reduce the construction cost, we analyze the TSHD construction data, carry out soil sampling test, and optimize the construction technology of TSHD. The implementation of the new construction technology has increased the construction productivity of Tianjin Port 300 000 DWT waterway by 37%, speeded up the construction progress, and cut down the construction cost.
出处
《水运工程》
北大核心
2014年第6期154-157,共4页
Port & Waterway Engineering
关键词
耙吸船
生产率
数据分析
施工工艺
TSHD
productivity
data analysis
construction technology