摘要
该文介绍了平顶山市湛河上游(凌云路湛河桥-新城区污水处理厂)河道整治的方案设计情况,分析了格宾石笼挡墙及镀高尔凡加筋麦克垫护坡在工程中的应用。
The article introduces the design of river control scheme at the upper reaches(Lingyun Road Zhan River Bridge ~ New Town Wastewater Treatment Plant) of Zhan River in Pingdingshan City, and analyzes the application of Gabion stone gabion retaining wall and coating Galfan reinforcement pad Mike slope in the projects.
出处
《城市道桥与防洪》
2014年第6期177-179,16,共3页
Urban Roads Bridges & Flood Control
关键词
河道整治
河道水面线
格宾石笼挡墙
镀高尔凡加筋麦克垫
河道护岸结构
river control,river water surface line,Gabin stone gabion retaining wall,coating Galfan reinforcement pad Mike slope,river revetment structure