摘要 为了减小新旧桥梁桩基基础沉降差异对桥梁造成的影响,采用桩底后压浆技术对新建桥梁钻孔灌注桩进行处理,通过对加固后的钻孔灌注桩周围的土体进行取样可知,桩底后压浆技术可以有效提高钻孔灌注桩周围土体的摩阻力,提高桩的承载力,减小新旧桥梁基础沉降差,有关经验可供相关专业人员参考。 In order to decrease the influence of the pile foundation settlement difference on old and new bridges, the pile bottom post pressure grouting technology is used to treat the cast-in-situ pile of the newly built bridge. According to the sample of soil surrounding the reinforced cast-in-situ pile, it is shown that this technology can efficiently improve the frictional resistance of soil surrounding the cast-in-situ pile,improve the bearing capacity of pile and decrease the foundation settlement difference of old and new bridges. The relative experience can be referred for the similar projects.
作者 刘泉 李茂奇
出处 《城市道桥与防洪》 2014年第6期208-210,18,共3页 Urban Roads Bridges & Flood Control
关键词 桩底后压浆 桥梁改扩建 钻孔灌注桩 沉降差 pile bottom post pressure grouting,bridge reconstruction and extension,cast-in-situ pile,settlement difference
  • 相关文献

参考文献4

二级参考文献5

共引文献27

同被引文献8

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部